Network DRP and BCP: Ensuring Business Continuity
Network DRP/BCP: Disaster Recovery Plan and Business Continuity Plan. NIS2/DORA + ISO 22301 requirements. Geo-redundant architecture, RTO/RPO, and semiannual testing. 2026 guide for CIOs.
BCP vs DRP
- BCP (Continuity): maintain operations during an incident (before recovery)
- DRP (Recovery): restore operations after a major disaster
- Both are required for complete resilience
Key Metrics
- RTO (Recovery Time Objective): maximum time before restoration
- RPO (Recovery Point Objective): acceptable data loss
- MTTR (Mean Time To Recover): actual average recovery time
- MTBF (Mean Time Between Failures): reliability
DR Architecture
Active-Active (2 operational DCs)
- Real-time synchronization
- Global load balancing (GSLB)
- RTO/RPO <1 min
- Cost: 2× infrastructure, but no unused capacity
- Synchronous replication: <100 km maximum
Active-Standby
- Secondary site in warm standby
- Automatic failover
- RTO <15 min, RPO <5 min
- Cost: 1.5× infrastructure
Cold DR
- Secondary site powered off and started after an incident
- RTO 4-24h, RPO depending on backup
- Cost-effective but slow
Geographic Distance
- <100 km: synchronous replication possible, with shared regional risk
- 100-500 km: asynchronous, fast replication
- >500 km: protection against regional disasters
- Multi-region cloud: AWS us-east-1 + eu-west-1
DR Network
- DCI: dedicated links between DCs (dark fiber, MPLS, Internet IPsec)
- DNS GSLB: public IP failover
- SD-WAN: automatic rerouting
- Network backup: 4G/5G for the secondary DC
Testing
- At least semiannually (strict annual requirement for certifications)
- Scenarios: DC loss, ransomware, cyberattack
- Real isolation (not a simulation)
- Detailed documentation + lessons learned
- Business stakeholder involvement is mandatory
Certifications / Compliance
- ISO 22301: Business Continuity Management
- NIS2: requires annual testing
- DORA: testing + TLPT for the financial sector
- HDS: mandatory BCP for healthcare
BCP/DRP Budget
- SMEs: 10-30% of the IT budget
- Mid-market companies: 15-25%
- Large enterprises: 20-35%
- Tier 1 (5 nines): 5% upgrade vs standard